Check before handover.
- Required approvals and acceptance records
- Outstanding work by location
- Record drawings and equipment information
- Operating and maintenance documents
- Training and familiarization
- Warranties and follow-up contacts
Agree the closeout list
Confirm the required record drawings, operating and maintenance information, warranties, training records and handover contacts with the appointed project team. The requirements depend on the contract, equipment and operating arrangements.
Track outstanding work
Give each item a location, description, responsible party, target date and status. Record how completion will be verified. Keep accepted exceptions separate from work that remains unresolved.
Prepare the operating team
Organize the handover information around the tasks of facilities and operational staff. Confirm where the records will be held, who can access them and which training or familiarization activities still need to be arranged.
Assign follow-up responsibility
Record the route for reporting issues after handover and the relevant warranty contacts and dates. Confirm who maintains the outstanding-item list and who can accept closure. Handover records do not replace required approvals or professional sign-off.